EPS Form Liners to Pour Four Piers for a New Bridge Project

Bridge project in Monticello, IN.

9 lb density EPS form liners

EPS form liners to pour four piers

Piers ranged in height from 29’ to 43’

 

Superior Construction used .9 lb density EPS form liners to pour four piers for a new bridge project in Monticello, IN. The piers ranged in height from 29’ to 43’. Because the concrete was poured in short lifts the lighter density expanded polystyrene was able to be used.

“You guys were great to work with and I was very satisfied with the work you have done.”